Skip to content

Crack Injection & Leak Sealing System

Leak Detection & Access Setup

For leaks at elevated locations, engage a qualified contractor to erect fireproof bamboo scaffolding or aluminium access towers to ensure safe working conditions at height.
Conduct close-range inspection of the leak area to accurately identify the source of water ingress and determine the appropriate repair approach.

Site Protection

Lay rubber mats, hollow boards, canvas sheeting, or other protective coverings to safeguard surrounding areas and finishes during the course of work.

Injection Nozzle Installation

Drill holes at suitable intervals along the identified cracks using an electric drill.
Insert injection nozzles (packers) to facilitate the subsequent injection of waterproofing material.

High‑Pressure Grouting

Utilise a high‑pressure grouting machine to inject waterproof expanding agents into the cracks, filling voids and sealing leakage paths.

Cleaning & Surface Restoration

Remove excess waterproofing material after injection.
Seal the grouting holes and restore the surface to its original condition, including plastering and painting as required.

Past Project References :

  • Ying Ming Court, Tseung Kwan O – Lift Shaft Bottom (2024)
  • Kings Wing Plaza Phase 2, Shek Mun, Sha Tin – Basement Carpark (2024)
  • Hong Sang House, Kin Sang Estate, Tuen Mun (2023)
  • 3/F, 162 Java Road, Sai Wan Ho (2022)
  • Unit B, 1/F, Block B, South Bay Villas (2022)
  • (Additional references available upon request)

Contact Us

Company Phone:2461 3168 / 2461 3933

Mobile / WhatsApp:9683 4714 (Mr Chan) / 6332 8428 (Mr Lai)

Email: region.water.ltd@gmail.com

Address: Flat 1321, 13/F, Block 2, Nan Fung Industrial City, Tuen Mun, NT, Hong Kong